first cut; we`re up and running

Well, that took some effort, but the workshop is almost there, machines all installed and leveled,  took a first cut on the lathe,just need to wire up the three phase sockets for the mill and we will be in action – 4 months to the day from the last cut in the old shop.

Working on boat-building shop today and got the benches installed, screwed to the existing structure and anchored into the concrete floor, with about 15meters of 4by2, and 6meters of recycled kitchen worktop – over engineered? Certainly!!!First cut in new shopsecuredownload-4

Bikes basking in the

Bikes basking in the sun

securedownload

and…here is a workshop floorplan

Workshop Floor Plan

Advertisements

2 thoughts on “first cut; we`re up and running

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s