December ’19 – a progress update…

Well winter is with us

A quick note on where we are at, while we wait to hear from Windermere Lake Wardens on our application for a berth at Ferry Nab next year….

The boat is back in Heggerscale, and we are working on the following items:

  • LP cylinder “small end” (crosshead bearing) replacement: This had worn, partly due to a severed oil line at some point last year, and partly due to the fact I had to “re-ream” it at erection time to correct some misalignment. So a new bush fitted and reamed to size.
  • HP valvechest to HP Cylinder block leak: This is a recurring problem, there just is very little sealing surface round the port pockets. This year’s fix is an Oakenstrong gasket and Steamseal – let’s see if this works!
  • Cabin roof: Learnt a lesson here about cheap plywood…A small leak around the  antenna cable resulted in the delamination of almost the complete forward part of the cabin roof. So it’s now been cut off, and will be replaced with “genuine” marine ply, and clad in epoxy and cloth like the hull – hopefully with more resilience! As it happens the removal of this rotten wood made the next job much easier.
  • Erecting the mast: As you may have read in an earlier post the Mast Partners had been made, so in the last few weeks we installed this on the boat, inserted the mast, and then started to wonder how on-earth we were going to raise the mast to a vertical position. Practical Junk Rig as usual came up with a good solution. This involved using a “bi-pod and running fore-guy” which worked faultlessly, so we saw the mast upright for the first time yesterday! This is almost a single-handed job, which is good, as it will be repeated each time we need to trailer and re-launch her.
    Mast-head fitting

    Masthead fitting, with halyard crane, and other blocks for various parrels and lasy-jacks.

    The next bit of this process, is to fit the masthead fitting (pictured above), (with navigation lights, VHF antenna and various shackles and blocks. Then we will cast a hard rubber square block at the foot of the mast, to secure it in the tabernacle base – the only problem with this is that the rubber components say they need to be mixed and poured at over 20-degrees C to cure, and it’s currently about -5-degrees C….

  • Once all this is done, we will put the boiler thru her annual test, and then reinstall the engine and hopefully enjoy SY Befur in her intended mode as a Sailing Yacht!
  • Oh yes, and we also need to turn a pile of sailcloth, blocks, shackles, rope and ally battens into a sail – more on that later!

Onwards!

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.